MaintenanceAfter initial high-water eventsand periodically thereafter, ask:
Has the culvert collected more material than planned?
- May require opening up the stream at the outlet to allow material to move more freely.
- Temporary excess filling can occur as stream adjusts to embedded design placed lower in stream profile than previous culvert.